Tuesday, March 20, 2012

03.20.12 Acworth

On Tuesday I went to Acworth to do the following maintenance in the building.

I did some touch up with stain on the interior doors and wood trim in the building. I had to sand it with a sand block to smooth the scratches and gouges out, then wipe them down real good to get the dust off, before I could stain the wood work.

Throughout the building I sprayed WD40 on the interior door hinges and door locks for them to shut properly without squeaking.

I had to anchor the copper line down to the slab in the mechanical room. I had to use a screw gun to drill the wholes for the anchor in the concrete slab with a masonry bit. Then I put the anchor into the concrete and put the clamp on top of the copper line to screw it down into the anchor to secure the line.

Today I raked the pine straw back around the slab of the outside shed.

worked 8 hours,

Jeff















I did some touch up with stain on the interior doors and wood trim in the building. I had to sand it with a sand block to smooth the scratches and gouges out, then wipe them down real good to get the dust off, before I could stain the wood work.






Throughout the building I sprayed WD40 on the interior door hinges and door locks for them to shut properly without squeaking.















I had to anchor the copper line down to the slab in the mechanical room. I had to use a screw gun to drill the wholes for the anchor in the concrete slab with a masonry bit. Then I put the anchor into the concrete and put the clamp on top of the copper line to screw it down into the anchor to secure the line.

















I did some more touch up with stain on the interior doors and wood trim in the building. I had to sand it with a sand block to smooth the scratches and gouges out, then wipe them down real good to get the dust off, before I could stain the wood work.








Today I raked the pine straw back around the slab of the outside shed.

No comments:

Post a Comment