Tuesday, January 31, 2012

01.31.12 Rome

On Tuesday I went to Rome to do the following work orders and maintenance in the building.

I used the man lift to be able to clean the lights that had broken plastic clips inside the lens that I had to remove through out the cultural hall. I had to drop the lens to remove the broken clips and put them back up. Mike and I also checked for emergency lights.

In the cultural hall I noticed a cover was about to fall from the ceiling, so I pulled the cover off and screwed it back to the top and put the cover back on.

The sprinkler head covers were all loose in the cultural hall from being hit with the basketballs or something else. I had to put them back in place and put new screws for them to be good and tightly secured on the ceiling.

The sensor wire for the won doors in the cultural hall was poking out of the ceiling and I pushed the wire back up in the ceiling in the proper place for it to not hang up on anything and it also looks a lot better.

I lubricated the pulpit control and checked the satellite and sound system and they all sound good.

The door stop was missing in the bishop's office and I put a new one on to stop it from hitting the caulk board.

I put a clear stick on paper holder on the glass near the door of the side entrance of the building. I wiped down and cleaned the glass real good before putting it up.

In the attic I had to change two ballasts and replaced 4 of the florescent light bulbs with the updated new ones.

Mike has the work order numbers for the work we did today, please check with him.

worked 8 hours,

Jeff




















I used the man lift to be able to clean the lights that had broken plastic clips inside the lens that I had to remove through out the cultural hall. I had to drop the lens to remove the broken clips and put it back up. Mike and I also checked for emergency lights.





In the cultural I noticed the cover was about to fall from the ceiling, so I pulled the cover off and screwed it back to the top and put the cover back on.








The sprinkler head covers were all loose in the cultural hall from being hit with the basketballs or something else. I had to put them back in place and put new screws for them to be good and tightly secured on the ceiling.





The sensor wire for the won doors in the cultural hall was poking out of the ceiling and I pushed the wire back up in the ceiling in the proper place for it to not hang up on anything and it also looks a lot better.






I lubricated the pulpit control and checked the satellite and sound system and they all sound good.





The door stop was missing in the bishop's office and I put a new one on to stop it from hitting the caulk board.





I put a clear stick on paper holder on the glass near the door of the side entrance of building. I wiped down and cleaned the glass real good before putting it up.






In the attic I had to change two ballasts and replaced 4 of the florescent light bulbs with the updated new ones.

Monday, January 30, 2012

01.30.12 Cartersville

On Monday I went to Cartersville to do the following maintenance in the building.

FBJ33175 I had to change 3 of the four foot fluorescent battery pack ballast and also the other ballast for the lights in the hallways to make them become emergency lights.

The ballast went out in the light in the attic and I had to replace the old ballast and put in a new bulb.

I took the front cover off the water fountain to clean the coils and clean the inside of it real good. Then put the cover back on.

The plumbing in the men and women's restrooms were working properly, no leaks found and the toilets all flushed good.

The lights in the chapel and cultural hall were working properly.

I checked all the interior doors and tightened the screws on the cylinders on the doors for them to close properly.

Worked 8 hours,

Jeff














FBJ33175 I had to change 3 of the four foot fluorescent battery pack ballast and also the other ballast for the lights in the hallways to make them become emergency lights.






The ballast went out in the light in the attic and I had to replace the old ballast and put in a new bulb.






I took the front cover off the water fountain to clean the coils and clean the inside of it real good. Then put the cover back on.










The plumbing in the men and women's restrooms were working properly, no leaks found and the toilets all flushed good.






The lights in the chapel and cultural hall were working properly.






I checked all the interior doors and tightened the screws on the cylinders on the doors for them to close properly.