Friday, January 6, 2012

01.06.12 Newnan

I went to Newnan to do the following work around the building.

In the font area yesterday that Richard asked me to repair by the door where it was cracking real bad by the corner on the sheet rock has been repaired. I had to sand it down and wipe it real good and vacuum the dust to clean the room. Then I painted the walls for it to be completed.

Jon had got a new concrete car stop. We replaced it in the parking lot, where the other one was broken.

Today I pressure washed the curves on the back side of the building by the sheds. Then I pressure washed on the other side of the church building, the car stops, curves and sidewalks.

Worked 8 hours,

Jeff









In the font area yesterday that Richard asked me to repair by the door where it was cracking real bad by the corner on the sheet rock has been repaired. I had to sand it down and wipe it real good and vacuum the dust to clean the room. Then I painted the walls for it to be completed.





Jon had got a new concrete car stop. We replaced it in the parking lot, where the other one was broken.














Today I pressure washed the curves on the back side of the building by the sheds. Then I pressure washed on the other side of the church building, the car stops, curves and sidewalks.