Through out the building I adjusted the strike plates as needed on the exterior doors for them to shut good and tight. I also lubricated the hinges and locks on every door.
FBJ3330 I checked the clocks in the bishop and clerk's office and they were all working properly.
I lubricated the hinges and locks on the interior doors and adjusted the cylinders on the interior doors through out the building for them to shut slowly and not slam shut making a noise.
I checked the won-doors and they were opening and closing properly. I had to tighten the handles on a few of them.
FbJ31975 I verified the ceiling tiles were repaired in the clerk's office that I done yesterday. (completed)
I checked the plumbing in the men and women's restroom and found no leaks and the toilets flushed properly.
The stopper in the font is sealing good and tight.
I checked the baby changing tables in the women and mother's room and had to tighten the screws so they would be secured to the walls.
The door stop was broken on the serving area door and I replaced it with a new one.
I touched up a few doors with stain through out the building that had scratches and chips on the bottom.
I lubricated the pulpit control and checked the satellite and sound system and they all sound good.
Worked 8 hours,
Jeff
Through out the building I adjusted the strike plates as needed on the exterior doors for them to shut good and tight. I also lubricated the hinges and locks on every door.
FBJ3330 I checked the clocks in the bishop and clerk's office and they were all working properly.
I lubricated the hinges and locks on the interior doors and adjusted the cylinders on the interior doors through out the building for them to shut slowly and not slam shut making a noise.
I checked the won-doors and they were opening and closing properly. I had to tighten the handles on a few of them.
FbJ31975 I verified the ceiling tiles were repaired in the clerk's office. (completed)
I checked the plumbing in the men and women's restroom and found no leaks and the toilets flushed properly.
The stopper in the font is sealing good and tight.
I checked the baby changing tables in the women and mother's room and had to tighten the screws so they would be secured to the walls.
The door stop was broken on the serving area door and I replaced it with a new one.
I touched up a few doors with stain through out the building that had scratches and chips on the bottom.
I lubricated the pulpit control and checked the satellite and sound system and they all sound good.
No comments:
Post a Comment