On my way to Rome I stopped at Lowe's the purchase the concrete chalking to repair the sidewalk issues.
FBJ28814 My plans were to repair the side walk issue, at the Rome building but the rain did not allow me to repair the cracks with chalking.
I checked the HVAC systems through out the Rome building and all are working properly with heat. (completed)
Cartersville Building:
FBJ29299 Checked the thermostat and it was working properly with heat. And also checked all others in the building. (completed)
FBJ29284 I checked the leak in the member custodial closet and it has been repaired by Michael Whitfield. (completed)
FBJ29147 I had to finish the patching on the sheet rock in the font area on the women's side by sanding it and putting a second coat of sheet rock mud and let it dry and had to sand it again, but there was no paint in the shed to match the color of the room. I will complete the job after I purchase the correct paint color to match the walls in the room.
FBJ29287 The water at the fountain by the outside of the kitchen was very cloudy and I had to open the valve all the way and flushed the line out. The water is coming out the fountain clear and is working properly. (completed)
FBJ13587 The concrete had a crack that I repaired with concrete chalking by the storefront near the shed. (completed)
Checked the lights in the attic and found no problems all are working properly. (completed)
No work order number was received; I noticed in two of the classrooms there was a hole in the wall and I patched them with sheetrock mud. (completed)
Stake Office Building: Did my normal walk through the building.
Checked the door locks and tighten the screws and lubricated them, all are closing and locking properly. (completed)
Checked all the lights in the building, all are working good, no burnt bulbs. (completed)
Checked all the plumbing in the restroom, kitchen and hot water heater all are working properly and found no leaks. (completed)
worked 8 hours
Jeff
Checked the HVAC systems through out the Rome building and all are working properly with heat. (completed)
Cartersville Building below:
FBJ29299 Checked the thermostat and it was working properly with heat. And also checked all others in the building. (completed)
FBJ29284 I checked the leak in the member custodial closet and it has been repaired by Michael Whitfield. (completed)
FBJ29147 I had to finish the patching on the sheet rock in the font area on the women's side by sanding it and putting a second coat of sheet rock mud and let it dry and had to sand it again, but there was no paint in the shed to match the color of the room. (not completed)
FBJ29287 The water at the fountain by the outside of the kitchen was very cloudy and I had to open the valve all the way and flushed the line out. (completed)
FBJ13587 The concrete had a crack that I repaired with concrete chalking by the storefront near the shed. (completed)
Checked the lights in the attic and found no problems all are working properly. (completed)
I noticed in two of the classrooms there was a hole in the wall and I patched them with sheetrock mud. (completed)
Stake Office Building below:
Checked all the door locks and tighten the screws and lubricated them, all are closing and locking properly. (completed)
Checked all the lights in the building, all are working good, no burnt bulbs. (completed)
Checked all the plumbing in the restroom, kitchen and hot water heater all are working properly and found no leaks. (completed)