FBJ29230 Loaded the marker board (4X6) and covered it with a tarp and some plastic in the back of my truck to prevent it from getting wet from the rain on my way home from Calhoun. I will bring it to Dougasville tomorrow 1/26/11 for Jon Wilkins.
(completed)
Checked the pulpit control, fuse, satellite and sound systems, all sounds good and working properly. (completed)
Checked the lights in the hallways and through out the building, all are working properly. (completed)
Checked all the HVAC systems in the building and all are working properly with heat. (completed)
FBJ29190 I repaired the back wheels on the upright vacuum cleaner with new screws and brackets. The axle was bent and I had to take it off and straighten it back out for it to mount back up with the wheels. (completed)
FBJ29183 Repaired the mortar at the hose bib on the backside of the building. I had to mix the red color and mortar mix and try to match the color to the other mortar mix the best I could. (completed)
I touched up some wood work on a few doors with stain that had chips and scratches on the bottom and midway of the door. (completed)
Worked 8 hours
Jeff
FBJ29230 Loaded the marker board (4X6) from Calhoun in the back of my truck to bring to Dougasville tomorrow 1.26.11 for Jon Wilkins.
Checked the pulpit control, fuse, satellite and sound systems, all sounds good and working properly. (completed)
Checked the lights in the hallways and through out the building, all are working properly. (completed)
Checked all the HVAC systems in the building and all are working properly with heat. (completed)
FBJ29190 I repaired the back wheels on the upright vacuum cleaner with new screws and brackets. (completed)
FBJ29183 Repaired the mortar at the hose bib on the backside of the building. (completed)