Checked the pulpit control, fuse, satellite and sound system in the chapel and all are working properly. (completed)
FBJ29283 The hand rail on the stairs that is broken off at the base is rusted needs to be repaired by another contractor. (not completed)
FBJ29282 I checked the microphone in the primary room and I need to get some parts to repair it. I connected a microphone that can be used for now that I took from the library. I put the temporary mic and cord rolled up on the table until I can repair the broken one. (not completed)
FBJ29169 Repaired the threshold cover in the Lost Mountain Bishop's office door. I had to pull it up and put new anchors and screw it back down to tighten it. (completed)
FBJ29093 Both of the fences and steeple have been pressure washed, all looks good, job well done by Taylor G/Roberts. (completed)
Checked all the HVAC systems in the building and all are working good with heat. (completed)
FBJ29193 I checked the Baptismal font water turn on valve on the hot side and it is not leaking, has been repaired by the contractor. (completed)
Worked 8 hours
Jeff
Checked the pulpit control, fuse, satellite and sound system in the chapel and all are working properly. (completed)
FBJ29283 The hand rail on the stairs that is broken off at the base and is rusted needs to be repaired. (not completed)
FBJ29282 I checked the microphone in the primary room and need to get some parts to repair it. I connected a microphone that can be used for now that I took from the library. (not completed)
FBJ29169 Repaired the threshold cover in the Lost Mountain Bishop's office door. (completed)
FBJ29093 Both of the fences and steeple have been pressure washed, all looks good, job well done. (completed)
Checked all the HVAC systems in the building and all are working good with heat. (completed)