Wednesday, January 5, 2011

1/5/11 Jonesboro

On Wednesday I went to meet James in Jonesboro to do the following maintenance work and moved lots of heavy furniture in the building.

Checked the pulpit control, fuse, satellite and sound system in the chapel, all are working good. (completed)

Checked the plumbing through out the building and found no leaks. (completed)

The outlet was loose and I had to tighten the screws and the cover. Checked all other outlets through out the building and they are all good. (completed)

In the cultural hall there was a switch that was real loose and I had to tighten the screws. The cover was broken, so I replaced it with a new one. (completed)

The holes in the walls needed to be patched and painted where I had to remove the anchors from them where items had been hanging on the wall. (completed)

Lots of boxes were stored on the top of the desk and floor in this room and needed to be removed to another room. We had to move the furniture around to get to some of the boxes. (completed)

This room is where we moved the boxes into. (completed)

Worked 8 hours

Jeff






Checked the pulpit control, fuse, satellite and sound system in the chapel, all are working good. (completed)



Checked the plumbing through out the building and found no leaks. (completed)




The outlet was loose and I had to tighten the screws and the cover. (completed)






The holes in the walls needed to be patched where there was different items hanging from them with anchors.






I had to patch the holes in the wall and paint them after the items had been taken off of them. (completed)








Lots of boxes were stored on the top of the desk and floor in this room and needed to be remove to another room. We had to move the furniture around to get to some of the boxes. (completed)




This room is where we moved the boxes into. (completed)

No comments: