There were cracks in the ceiling in the Primary room and I repaired them with sheetrock mud and all looks good. (completed)
I patched the 3 holes underneath the switch in the font area and once it dries it will show up white the same as the wall. (completed)
FBJ13647 The switch has been moved from the bottom of the font to the top of the steps by ABG and is working good. (completed)
I checked the plumbing in kitchen and restrooms, flushed all toilets and found no leaks, all is working properly. (completed)
Checked the lights in the attic and the hallways and all are working good. (completed)
Checked the HVAC systems through out the Mars Hill building and all are working properly with heat. (completed)
Work done in the CSV Stake Center:
I checked the emergency lights over the door and it is working good. (completed)
Checked the lights through out the stake center and all are working properly. (completed)
Checked the HVAC system and it was working properly with heat. (completely)
I checked the plumbing in the kitchen and found no leaks and all is working properly. (completed)
FBJ29301 The toilet in the Cartersville Stake office continued running. I repaired the toilet with a new flush valve kit and it is working properly. (completed)
worked 8 hours
Jeff
There were cracks in the ceiling in the Primary room and I repaired them with sheetrock mud and all looks good. (completed)
I patched the 3 holes underneath the switch in the font area and once it dries it will show up white as the same as the wall. (completed)
FBJ13647 The switch has been moved from the bottom of the font to the up of the steps by ABG and is working good. (completed)
I checked the plumbing the kitchen and restrooms, flushed all toilets and found no leaks, all is working properly. (completed)
Checked the lights in the attic and the hallways and all are working good. (completed)
Checked the HVAC systems through out the Mars Hill building and all are working properly with heat. (completely)
Work done in the CSV Stake Center below:
I checked the emergency lights over the door and it is working good. (completed)
Checked the lights through out the stake center and all are working properly. (completed)
Checked the HVAC system and it was working properly with heat. (completely)
I checked the plumbing in the kitchen and found no leaks and all is working properly. (completed)
FBJ29301 The toilet in the Cartersville Stake office continued running. I repaired the toilet with a new flush valve kit and it is working properly. (completed)