On Wednesday on my way to Dallas I stopped by Home Depot to purchase some items, a vent for the back of the shed, gallon of yellow paint, a paint brush and two hangman cleats do the following work orders and maintenance in the building.

I took the beater bar out of the vacuum and clean it, by cutting out string, hair and dirt and sprayed it with WD40 and put it back together. It is working properly for the time being, but has a bunch of rough mileage on it. I also checked the other blue vacuum and no problem was found, working good. (completed)

Checked the pulpit control, fuse, satellite and sound system in the chapel, all are working properly. (completed)

Checked lights down the hallways, no problems were found, all working good. (completed)

FBJ29131 Someone turned the water valve off and I turned it back on and checked the toilet. I found no leaks and it is flushing properly. (completed)

Checked all other plumbing through out the building in kitchen and restrooms, all are working properly. (completed)

FBJ13613 Painted the two post in front of the shed and the other two post in front of the dumpster. (completed)

FBJ13614 Replaced the vent in back of the shed. I had to drill four new holes to anchor the new vent on the shed. (completed)

FBJ29189 A new hose needs to be ordered for the vacuum that has a blue cord that is split at the end of the attachment with duct tape on it. (not completed)

Worked 8 hours

Jeff







I took the beater bar out of the vacuum and clean it, by cutting out string, hair and dirt and sprayed it with WD40 and put it back together. It is working properly for the time being, but has a bunch of rough miles on it. (completed)




Checked the pulpit control, fuse, satellite and sound system in the chapel, all are working properly. (completed)



Checked lights down the hallways, no problems were found, all working good. (completed)



FBJ29131 Someone turned the water valve off and I turned it back on and checked the toilet. I found no leaks and it is flushing properly. (completed)




Checked all other plumbing through out the building in kitchen and restrooms, all are working properly. (completed)








FBJ13613 Painted the two post in front of the shed and the other two post in front of the dumpster. (completed)




FBJ13614 Replaced the ridge vent in back of the shed. (completed)