I did a walk through the Stake Office and checked the building, all seems to be good and working properly.
Checked the pulpit control, fuse, satellite and sound system in the chapel, all is working and sounds good. (completed)
All lights through out the hallways were checked and working good, no problems. (completed)
Checked the plumbing in the kitchen and all restrooms through out the building and all are working properly. No leaks were found. (completed)
Checked the lights in the attic and all are working properly. (completed)
FBJ29192 Checked the HVAC systems throughout the building and all are working properly with heat, found no problems. I am thinking Mike Stephens must have repaired the problem from the previous work order. (completed)
FBJ29147 Patched the sheetrock on the women's side in the font area. The humidity did not allow the mudding to try, so I was not able to finish the patching and painting work. (not completed)
A member of the ward ask me to repair the chalk board in the primary room. Somebody pulled the anchor out and I had to pull one side of the chalk board out to reset the anchor to mount it back on the wall properly. (completed)
Worked 8 hours
Jeff
Checked the pulpit control, fuse, satellite and sound system in the chapel, all is working and sounds good. (completed)
All lights through out the hallways were checked and working good, no problems. (completed)
Checked the plumbing in the kitchen and all restrooms through out the building and all are working properly. (completed)
Checked the lights in the attic and all are working properly. (completed)
FBJ29192 Checked the HVAC systems throughout the building and all are working properly with heat, found no problems. (completed)
FBJ29147 Patched the sheetrock on the women's side in the font area. (not completed)