Thursday, January 6, 2011

1/6/11 Jonesboro, Tucker and Douglasville

On Thursday James and I went to Jonesboro, Tucker and Douglasville to do the following work orders and maintenance in the buildings.

James and I went to Jonesboro to load the furniture in the back of the trailer to deliver it to Tucker. (completed)

We delivered and unloaded 3 file cabinets, a bookcase and one wooden 2 drawer file cabinet to Tucker. (completed)

We delivered and unloaded the desk and desktop in Douglasville in room 110. I touched up the woodwork with stain where it had scratches and chips as needed. (completed)

We delivered and unloaded the condenser and a black leather chair to Ms. Mary's office in Douglasville. (completed)

FBJ29133 I checked in room 116 and the painting was completed and the job was well done. (completed)

Checked all the HVAC systems through out the Douglasville building and all is working good. (completed)

Worked 8 hours

Jeff







James and I went to Jonesboro to load the furniture in the back of the trailer to deliver it to Tucker. (completed)



We delivered and unloaded 3 file cabinets, a bookcase and one wooden 2 drawer file cabinet to Tucker. (completed)




We delivered and unloaded the desk and desktop in Douglasville in room 110. I touched up the woodwork with stain where it had scratches and chips as needed. (completed)



We delivered and unloaded the condenser to Ms. Mary's office in Douglasville. (completed)