Friday, December 30, 2011

12.30.11 Newnan

On Friday I went to Newnan to do the following work around the building.

On side of the church where the AC units are located I had to sweep the leaves off the cement and pressure wash inside the wall that needed to be washed.

I completed pressure washing the church. I had to use the ladder to get on top of the roof on one side of the church to spray the facial, eaves and the white medal with bleach and scrubbed it with a brush, then pressure washed it.

I was able to pressure wash some of the curbs. I had to spray it with bleach to get the tough spots off.

I sprayed the shed with bleach and had to scrub it, then pressure washed it to get it clean.

Worked 8 hours,

Jeff









On side of the church where the AC units are located I had to sweep the leaves off the cement and pressure wash inside the wall that needed to be washed.
















I completed pressure washing the church. I had to use the ladder to get on the roof on one side to spray the facial and eaves and the white medal with bleach and scrubbed it with a brush, then pressure washed it.











I was able to pressure wash some of the curbs. I had to spray it with bleach to get the tough spots off.





I sprayed the shed with bleach and had to scrub it, then pressure washed it .

Thursday, December 29, 2011

12.29.11 Newnan

Today on Thursday I went to the Newnan building to do the following work.

I continued to pressure wash the other side of the church building. I had to spray the gutters and the white areas with gutter cleaner and scrubbed it with a brush and rinsed it off. I pressure washed the area where the AC units are located that had spots on the cement to clean. And the wall in front of the AC units. I also pressure washed the AC units real good. I still have more to wash tomorrow.

Worked 7 hours,

Jeff













I continued to pressure wash the other side of the church building. I had to spray the gutters and the white areas with gutter cleaner and scrubbed it with a brush and rinsed it off. I pressure washed the area where the AC units are located that had spots on the cement to clean. And the wall in front of the AC units. I also pressure washed the AC units real good.

Wednesday, December 28, 2011

12.28.11 Newnan

On Wednesday I went to Newnan to pressure wash the outside of the church.

First I had to go to Glenridge to get the pressure washer to wash the church building in Newnan. I had to take the breather off and cleaned the carburetor for the pressure washer to crank. The tires were flat and I had to stop by the gas station to put air in them and get some gas.
I pressure washed around the building and the gutters, windows, doors and the area where the AC units are located. Before I used the washer I had to spray degreaser on the gutters and scrubbed them to get them clean. And I also pressure washed a couple of the sidewalks.

Worked 8 hours,

Jeff















Today I pressure washed around the building and the gutters, windows, doors and the area where the AC units are located. And I also washed a couple of the sidewalks.

Tuesday, December 27, 2011

12.27.11 Douglasville

On Tuesday I went to Douglasville to do the following maintenance work around the building.

I cleaned the bugs out of the lights outside in the parking lot. I had to use and move the giant ladder to each light pole to be able to reach the lens to clean it.

I cleaned the leaves out of the gutters all around the outside of the building.

I had to tighten the table legs one of the classroom tables that was about to fall off. I checked all the other tables and they were in good shape.

I noticed the clock in one of the classrooms was not working, so I had to put a new battery in it. It is now working properly.

The lights in the cultural hall were all working properly.

Worked 6 hours,

Jeff



















I had to use the giant ladder to clean the bugs out of the lights outside in the parking lot.














I cleaned the leaves out of the gutters all around the outside of the building.





I had to tighten the classroom table leg that was about to fall off. I checked all the other tables and they were in good shape.




I noticed the clock in one of the classrooms was not working, so I had to put a new battery in it. It is now working properly.





The lights in the cultural hall were all working properly.