In room 101 I had to wet sand the mud that I mudded on the ceiling. I also mudded a few spots that needed to be patched.
In room 102 I had to wet sand the mud that I mudded on the ceiling.
In room 103 I had to do lots of wet sanding on the ceiling and walls. I had to re-mud along the door frame and in several areas and touched up the walls that were tinged real bad. I also cleaned up with the vacuum cleaner.
I noticed in primary room the clock wasn't running, so I checked it and it needed a new battery. I replaced the old one and now it is working.
worked 8 hours,
Jeff
In room 101 I had to wet sand the mud that I mudded on the ceiling. I also mudded a few spots that needed to be patched.
In room 102 I had to wet sand the mud that I mudded on the ceiling.
In room 103 I had to do lots of wet sanding on the ceiling and walls. I had to re-mud along the door frame and in several areas and touched up the walls that were tinged real bad. I also cleaned up with the vacuum cleaner.
I noticed in primary room the clock wasn't running, so I checked it and it needed a new battery. I replaced the old one and now it is working.