Thursday, December 22, 2011

12.22.11 Peachtree City

On Thursday I went to Peahtree City to do the following work in the building to prepare the rooms for painting.

In room 101 I had to wet sand the mud that I mudded on the ceiling. I also mudded a few spots that needed to be patched.

In room 102 I had to wet sand the mud that I mudded on the ceiling.

In room 103 I had to do lots of wet sanding on the ceiling and walls. I had to re-mud along the door frame and in several areas and touched up the walls that were tinged real bad. I also cleaned up with the vacuum cleaner.

I noticed in primary room the clock wasn't running, so I checked it and it needed a new battery. I replaced the old one and now it is working.

worked 8 hours,

Jeff








In room 101 I had to wet sand the mud that I mudded on the ceiling. I also mudded a few spots that needed to be patched.






In room 102 I had to wet sand the mud that I mudded on the ceiling.






















In room 103 I had to do lots of wet sanding on the ceiling and walls. I had to re-mud along the door frame and in several areas and touched up the walls that were tinged real bad. I also cleaned up with the vacuum cleaner.





I noticed in primary room the clock wasn't running, so I checked it and it needed a new battery. I replaced the old one and now it is working.