I had to change out the sloan flushmate insert in the men's restroom in Fayetteville. The bolts were real hard to get off the back end of the toilet. I had to use a needle nose pliers to hold the screw from turning so I could back the nut off the bottom to get the back of the tank off to change the insert.
In Fayetteville I hung a picture on the wall in the bishop's office.
FBJ32238 In Peachtree City I had to mud the walls in room 111 in a bunch of spots that had gouges and dings in the sheet rock. After it dried I wiped it down real good to sand and seal the spots I mudded. After sanding it I wiped it down again and vacuumed the carpet to remove the dust. I had to tape and trimmed out using a paint brush around the room in the corners and the woodtrim. Then I painted all four walls using a roller to complete it. I will take a picture of the room tomorrow after I paint a second coat.
FBJ32238 In the cultural hall walking up the steps to the stage Jon asked me to do some mudding, sanding and painting in that room.
FBJ33203 In Peachtree City I had to change out the sloan flushmate insert in the women's restroom. The bolts were real hard to get off the back end of the toilet. I had to use a needle nose pliers to hold the screw from turning so I could back the nut off the bottom to get the back of the tank off to change the insert.
Worked 9 hours,
Jeff
I had to change out the sloan flushmate insert in the men's restroom in Fayetteville. The bolts were real hard to get off the back end of the toilet. I had to use a needle nose pliers to hold the screw from turning so I could back the nut off the bottom to get the back of the tank off to change the insert.
In Fayetteville I hung a picture on the wall in the bishop's office.
FBJ32238 In Peachtree City I had to mud the walls in room 111 in a bunch of spots that had gouges and dings in the sheet rock. I had to let it dry, then I wiped it down real good. I had to sand and seal the spots I mudded. I also vacuumed the carpet to get remove the dust. I had to tape and trimmed out using a paint brush around the room in the corners and the woodtrim. Then I painted all four walls using a roller to complete it. I will take a picture of the room tomorrow after I paint a second coat.
FBJ32238 In the cultural hall walking up the steps to the stage Jon asked me to do some mudding, sanding and painting in that room.
FBJ33203 In Peachtree City I had to change out the sloan flushmate insert in the women's restroom. The bolts were real hard to get off the back end of the toilet. I had to use a needle nose pliers to hold the screw from turning so I could back the nut off the bottom to get the back of the tank off to change the insert.
No comments:
Post a Comment