On Wednesday I went to Fayetteville and Peachtree City to do the following maintenance work in the building.

In Fayetteville I had to check to see if there was a water leak in the attic. I went upstairs in the attic then I had to climb up another ladder to get to the man whole to get to the rafters. Then I had to stoop down almost in a crawling position to get to the front of the church to get to top of the chapel. I had to shine my flashlight all between the rafters and could not find any water leaks.

I had to clean the coils of the water fountains. I took unscrew four screws to take the bottom cover off and vacuumed the coils and wiped down the compression and cleaned the spider webs out.

In room M102 I had to re-mud around the vent pipe that was going out to the roof. I also had to mud several screw holes that was in the sheet rock.

In the Peachtree City building in room M101 I had to sand down a lot of the sheet rock that someone else mudded. I used a sand block to sand it down enough to make it look better for me to prepare to re-mud it tomorrow. After sanding I had to dust the pipes and vacuum the floor and units.

In room M103 I took pictures of the mud that was done by someone else that I need to sand down to smooth out, so I can re-mud it again. There were several peeling spots that I peeled the paint off of the sheet rock and had to sand it to prepare it for me to re-mud tomorrow. There was several screw holes that I re-mudded today and will probably have to redo tomorrow.

worked 8 hours,

Jeff













In Fayetteville I had to check to see if there was a water leak in the attic. I went upstairs in the attic then I had to climb up another ladder to get to the man whole to get to the rafters. Then I had to stoop down almost in a crawling position to get to the front of the church to get to top of the chapel. I had to shine my flashlight all between the rafters and could not find any water leaks.










I had to clean the coils of the water fountains. I took the bottom cover off and vacuumed the coil and wiped down the compression and cleaned the spider webs out.






In room M102 I had to re-mud around the vent pipe that was going out to the roof. I also had to mud several screw holes that was in the sheet rock.







In the Peachtree City building in room M101 I had to sand down a lot of the sheet rock that someone else mudded. I used a sand block to sand it down enough to make it look better for me to prepare to re-mud it tomorrow. After sanding I had to dust the pipes and vacuum the floor and units.
















In room M103 I took pictures of the mud that was done by someone else that I need to sand down to smooth out, so I can re-mud it again. There were several peeling spots that I peeled the paint off of the sheet rock and had to sand it to prepare it for me to re-mud tomorrow. There was several screw holes that I re-mudded today and will probably have to redo tomorrow.