Jon asked me to clean around the dumpster. There was a bunch of leaves and debris behind the dumpster, so I raked, shoveled and cleaned it up. And threw it in the dumpster.
I was asked to put plywood on the floor in the outside shed. I had to go to Home Depot to purchase it. I took out all the boxes and swept the floor real good in the shed. I had to measure and cut the plywood to fit the floor. I put everything back neatly in the shed.
The drain was busted by the fence near the A/C units outside. I had to dig around several roots to get it out to replace it with a new one. I had a work order number for this, but I miss placed it. This is completed.
FBJ33137 I had to re-glue the vinyl in the chapel around the windows and in the back corners. (completed)
worked 8 hours,
Jeff
Jon asked me to clean around the dumpster. There was a bunch of leaves and debris behind the dumpster, so I raked, shoveled and cleaned it up. And threw it in the dumpster.
I took out all the boxes and swept the floor real good in the outside shed. I was asked to put plywood on the floor, I had to measure and cut it to fit the floor. I put everything back neatly in the shed.
The drain was busted by the fence near the A/C units outside. I had to dig around several roots to get it out to replace it with a new one.
FBJ33137 I had to re-glue the vinyl in the chapel around the windows and in the back corners.
No comments:
Post a Comment