Monday, February 28, 2011

02.28.11 Mars Hill

On Monday I went to Mars Hill to do the preparation for the Stake Conference on March 5th and 6th.

FBJ29449 Stake Conference Preparation:
On the backside of the building the soffit medal strip was hanging down and I had to repair it by screwing it back into the studs.

I adjusted the outside light on the back side of the building to shine out, instead of it shining down on the building.

Checked the thermostat controls and they were all working with heat.

Looked and listened to the indoor and outside units for any abnormal condition and they sounded good.

Checked the lights in the chapel rostrum, cultural hall and all other rooms in the building and all are working properly.

Checked and lubricated the pulpit control and checked the fuse, satellite and sound system all is working good.

Checked all the clocks on the wall and had to reset a couple and all others were set to the proper time.

Looked at the fire alarm control and the reading on the system checked normal.

The 2 foot light by room 103 was out and I had to change the ballast and the bulb.

Checked the outside parking lot lights with the photocell and they all were working good.

Did a walk outside and the grass was mowed, edges, trees and shrubs all looked trimmed and neat.

The sprinkler head timers are off at this time and they look in good condition.

The ventilation fan in the men's restroom was making noise, so I took the cover off and lubricated the barrens and it sounds better.

Checked the vacuum cleaners and lubricated them and they are working good.

I lifted both basketball goals up and down with the switch and they are working properly.

There was a 4 foot florescent bulb that was burnt in the high light in the cultural hall that I had to replace with a new one.

Worked 8 hours

Jeff








On the backside of the building I had to repair the soffit medal strip by screwing it back into the studs.




I adjusted the outside light on the building to shine out, instead of it shining down on the building.



Checked the thermostat controls and they were all working with heat.






Looked and listened to the indoor and outside units for any abnormal condition and they sounded good.




Checked the lights in the chapel rostrum, cultural hall and all other rooms and all are working properly.




Checked and lubricated the pulpit control and checked the fuse, satellite and sound system all is working good.




Checked all the clocks on the wall and had to reset a couple and all others were set to the proper time.



Looked at the fire alarm control and the system checked normal.




The 2 foot light by room 103 was out and I had to change the ballast and the bulb.





Checked the outside parking lot lights with the photocell and they all working good.










Did a walk outside and the grass was mowed, edges, trees and shrubs all looked trimmed and neat.





The sprinkler head timers are off at this time and they look in good condition.




The ventilation fan in the men's restroom was making noise, so I took the cover off and lubricated the barrens and it sounds better.



Checked the vacuum cleaners and lubricated them and they are working good.




I lifted both basketball goals up and down with the switch and they are working properly.




There was a 4 foot florescent bulb that was burnt in the high light in the cultural hall that I replaced with a new one.

Friday, February 25, 2011

02.25.11 Cedartown and Buchanan

Went to Cedartown and Buchanan on Friday to do the following work orders and maintenance in the buildings.

Checked the thermostat controls through out the building and all are working with heat.

Checked the changing tables and plumbing in the women's restroom and found no leaks, all working properly.

Checked all lights through out the building and changed a burnt light bulb in the hall way. All others are working good.

Checked, cleaned and lubricated the vacuum cleaner and they are all working properly.

Checked all plumbing in the men's restroom and throughout the building and found no leak, all is working properly.

I had to adjust the strike plate for the door to close tight. Checked all other doors and they are closing properly.

Tighten the legs on all the classrooms tables are needed. One of the tables had only one screw in the leg and was barely standing up and put four screws to repair it.

The high light in the cultural hall was burnt and I had to get the giant ladder from the shed to change the light bulb.

Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all is good.

FBJ28813 I repaired several places on the sidewalk with concrete caulking that was more than 1/2 inch wide.

FBJ28813This is where the sidewalk is significantly lower that the curb and is a tripping hazard. It needs to be ground down level with the sidewalk with a machine.

Work done in Buchanan:

Checked the plumbing in the men's restroom and found no leaks, all is working properly.

Checked the plumbing and changing tables in the women's restroom all is working good, no leaks.

Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all are working good.

Checked the lights through out the building and all are working properly.

Worked 8 hours

Jeff




Work done in Cedartown:


Checked the thermostat controls through out the building and all are working with heat.






Checked the changing tables and plumbing in the women's restroom and found no leaks, all working properly.






Checked all lights through out the building and changed a burnt light bulb in the hall way. All others are working good.



Checked, cleaned and lubricated the vacuum cleaner and they are all working properly.




Checked all plumbing in the men's restroom and throughout the building and found no leak, all is working properly.




I had to adjust the strike plate for the door to close tight. Checked all other doors and they are closing properly.




Tighten the legs on all the classrooms tables are needed.




The high light in the cultural hall was burnt and I had to get the giant ladder from the shed to change the light bulb.




Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all is good.
















FBJ28813 I repaired several places on the sidewalk with concrete caulking that was more than 1/2 inch wide.



FBJ28813This is where the sidewalk is significantly lower that the curb and is a tripping hazard. It needs to be ground down level with the sidewalk with a machine.


Work done in Buchanan:




Checked the plumbing in the men's restroom and found no leaks, all is working properly.





Checked the plumbing and changing tables in the women's restroom all is working good, no leaks.



Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all are working good.




Checked the lights through out the building and all are working properly.