Tuesday, February 22, 2011

02.22.11 Cartersville and Stake Office

On Tuesday I went to Cartersville to do the following work orders and maintenance work in the building.

FBJ29353 or FBJ29147 (not sure which work order number is the correct one) Needed to run one more coat on the sheetrock in the font area on the women's side for it to be ready to paint. If the same color paint isn't available the whole room may need to be repainted.

Checked the thermostat control through out the building all is working good with heat.

FBJ29373 In the custodial room I replaced the attic door to keep the cold air from coming into the building. I had to get a ladder to climb into the attic to get the door to put it back on. (completed)

FBJ29372 I sprayed some distilled water on the sisal that was bubbling in a few areas in the hallway. (completed)

FBJ29024 The carpet in the hallway and cultural hall has not been replaced yet.

FBJ29286 I patched the hole that was in the wall in the sacrament prep room and put a wall doorstop cover over the patch. (completed)

Checked and lubricated the pulpit control and checked the fuse, satellite and sound system, all is working properly.

Checked the plumbing through out the building and found no leaks, all is working properly.

Checked the lights in the attic, hallway and through out the building.

In the cultural hall in the high lights I had to change 4 four foot fluorescent light bulbs and one ballast.

After leaving Cartersville I went to the Stake Office and did a walk through the building.

Checked the lights through out the Stake Office building and all are working good.

Checked the plumbing in the restroom and kitchen at the Stake Office, all is working good, no leaks were found.

Worked 8 hours

Jeff







FBJ29353 or FBJ29147 (not sure which work order number is the correct one) Needed to run one more coat on the sheetrock in the font area on the women's side for it to be ready to paint.



Checked the thermostat control through out the building all is working good with heat.




FBJ29373 In the custodial room I replaced the attic door to keep the cold air from coming into the building.. (completed)





FBJ29372 I sprayed some distilled water on the sisal that was bubbling in a few areas in the hallway. (completed)




FBJ29024 The carpet in the hallway and cultural hall has not been replaced yet.




FBJ29286 I patched the hole that was in the wall in the sacrament prep room and put a wall doorstop cover over the patch. (completed)




Checked and lubricated the pulpit control and checked the fuse, satellite and sound system, all is working properly.




Checked the plumbing through out the building and found no leaks.




Checked the lights in the attic, hallway and through out the building.








In the cultural hall in the high lights I had to change 4 four foot fluorescent light bulbs and one ballast.







Checked the lights through out the Stake Office building and all are working good.



Checked the plumbing in the restroom and kitchen at the Stake Office, all is working good, no leaks were found.