Wednesday, February 2, 2011

02.02.11 Dallas

On Wednesday I went to Dallas to do the following work orders in the building.

Bobby dropped off a service missionary, named Chris to help me install the water fountains in the building and after the work was done I drove him back to Douglasville to the house he is staying at during his mission.

FBJ28935 Installed two new drinking fountains in the hallway by the Bishop's office. I had to unscrew the brackets off the wall to take down the old fountains and screw the new brackets to install the new ones, but the water and drain lines were not lining up. I went to Lowe's and had to get a few parts (reducer and a couple of couplers) for the drain and water line pipes to match and hook up properly. I had to measure and cut the pipes different sizes to connect all the parts for them to fit correctly. I had to cut a notch out of the bottom of the water fountain to make the bottom cover fit around the drain pipe because the drain lines were too low. While I was installing the new lines, it was real tight and time consuming to work on. (completed)

FBJ29273 I hung the fire extinguisher in the serving area on the wall. (completed)

FBJ29274 Checked the water valve for the toilet and someone had turned it off. I turned the water back on and flushed it and it is working good. (completed)

I received a phone call from Ms. Mary and was asked to meet Dalea Snell outside to unload a toy cabinet from her truck to bring into the church building for the boys to install.

Worked 9 hours

Jeff






FBJ28935 Installed two new drinking fountains in the hallway by the Bishop's office. (completed)




FBJ29273 I hung the fire extinguisher in the serving area on the wall. (completed)



FBJ29274 Checked the water valve for the toilet and someone had turned it off. I turned the water back on and flushed it and it is working good. (completed)

No comments:

Post a Comment