Checked the thermostat controls through out the building and all are working with heat.
Checked the changing tables and plumbing in the women's restroom and found no leaks, all working properly.
Checked all lights through out the building and changed a burnt light bulb in the hall way. All others are working good.
Checked, cleaned and lubricated the vacuum cleaner and they are all working properly.
Checked all plumbing in the men's restroom and throughout the building and found no leak, all is working properly.
I had to adjust the strike plate for the door to close tight. Checked all other doors and they are closing properly.
Tighten the legs on all the classrooms tables are needed. One of the tables had only one screw in the leg and was barely standing up and put four screws to repair it.
The high light in the cultural hall was burnt and I had to get the giant ladder from the shed to change the light bulb.
Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all is good.
FBJ28813 I repaired several places on the sidewalk with concrete caulking that was more than 1/2 inch wide.
FBJ28813This is where the sidewalk is significantly lower that the curb and is a tripping hazard. It needs to be ground down level with the sidewalk with a machine.
Work done in Buchanan:
Checked the plumbing in the men's restroom and found no leaks, all is working properly.
Checked the plumbing and changing tables in the women's restroom all is working good, no leaks.
Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all are working good.
Checked the lights through out the building and all are working properly.
Worked 8 hours
Jeff
Work done in Cedartown:
Checked the thermostat controls through out the building and all are working with heat.
Checked the changing tables and plumbing in the women's restroom and found no leaks, all working properly.
Checked all lights through out the building and changed a burnt light bulb in the hall way. All others are working good.
Checked, cleaned and lubricated the vacuum cleaner and they are all working properly.
Checked all plumbing in the men's restroom and throughout the building and found no leak, all is working properly.
I had to adjust the strike plate for the door to close tight. Checked all other doors and they are closing properly.
Tighten the legs on all the classrooms tables are needed.
The high light in the cultural hall was burnt and I had to get the giant ladder from the shed to change the light bulb.
Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all is good.
FBJ28813 I repaired several places on the sidewalk with concrete caulking that was more than 1/2 inch wide.
FBJ28813This is where the sidewalk is significantly lower that the curb and is a tripping hazard. It needs to be ground down level with the sidewalk with a machine.
Work done in Buchanan:
Checked the plumbing in the men's restroom and found no leaks, all is working properly.
Checked the plumbing and changing tables in the women's restroom all is working good, no leaks.
Checked the pulpit control and lubricated it and checked the fuse, satellite and sound system, all are working good.
Checked the lights through out the building and all are working properly.