I brought the extra water fountain to Douglasville and placed it in the shed. Before loading the portable chalkboard in my truck from Douglasville to bring it to Rome I opened the box and checked for damages, and found none.
FBJ28814 In Rome I chalked the sidewalks that were greater than 1/2 inch in a few areas with concrete repair chalking.
In Rome I adjusted the strike plate on one of the doors for it to shut tight and properly and also checked all doors in the building. (completed)
Checked the thermostat controls in the Rome building and the heat was working properly. (completed)
FBJ29099 I went to Douglasville to pick up the portable chalkboard to bring to Rome. I looked for damages before loading it in my truck. After arriving in Rome I unloaded the chalkboard and assembled it together and placed it in the cultural hall. (completed)
I was asked to change the light bulb to a higher wattage of 150 to make it as bright as the other light at Douglasville in the front of the church. (completed)
Checked the thermostat control in the Douglasville building and all were working good with heat. (completed)
Worked 8 hours
Jeff
FBJ28814 In Rome I chalked the sidewalks that were greater than 1/2 inch in a few areas with concrete repair chalking.
In Rome I adjusted the strike plate on one of the doors for it to shut tight and properly and also checked all doors in the building. (completed)
FBJ29099 I went to Douglasville to pick up the portable chalkboard to bring to Rome. I looked for damages before loading it in my truck. (completed)
I was asked to change the light bulb to a higher wattage of 150 to make it as bright as the other light. (completed)
Checked the thermostat control in the Douglasville building and all were working good with heat. (completed)