The threshold plates in the cultural hall doorways needed new screws and I had to tighten the screws for it to be good and tight.
The lock on the door to the right of the stage was loose. I had to lubricate it and tightened the lock back up on the door, so it could lock properly. I was asked to check all the other doors and locks throughout the building and they are all closing and locking properly. (completed)
The plate was sticking up from the floor in the back of the chapel. I had to replace it with longer screws into the plate and screwed it into the floor, good and tight.
I repaired the baby changing table in the women's restroom. I had to put new anchors in the wall and screw the changing table to the wall. I was able to repair this before I received a work order number. (completed)
Checked the pulpit control and lubricated it, also checked the fuse, satellite and sound system, all sounded good. I also was asked to check the microphone in the primary room. The clerk was with me and he also heard the microphone working properly.
I tightened all the screws on the legs of all the classroom tables in the building.
Checked the lights through out the building and all are working properly.
FBJ29432 The toilet in the women's restroom is now working properly. I had to adjust the screw on the flushing tank flow for the toilet to have enough to flush. (completed)
Checked the plumbing in the men's restroom and found no leaks, all is working properly.
Checked the thermostat controls in the building and all are working good with heat.
Worked 8 hours
Jeff
The threshold plates in the cultural hall doorways needed new screws and I had to tighten the screws for it to be good and tight.
The lock on the door to the right of the stage was loose. I had to lubricate it and tightened the lock back up on the door, so it could lock properly. (completed)
The plate was sticking up from the floor, I had to replace longer screws into the plate and screwed it into the floor, good and tight.
I repaired the baby changing table in the women's restroom. I had to put new anchors in the wall and screw the changing table to the wall. (completed)
Checked the pulpit control and lubricated it, also checked the fuse, satellite and sound system, all sounded good.
I tightened all the screws on the legs of all the classroom tables in the building.
Checked the lights through out the building and all are working properly.
FBJ29432 The toilet in the women's restroom is now working properly. I had to adjust the screw on the flushing tank flow for the toilet to have enough to flush. (completed)
Checked the plumbing in the men's restroom and found no leaks, all is working properly.
Checked the thermostat controls in the building and all are working good with heat.