I had to go to Home Depot to get some concrete caulking repair to caulk the sidewalk issues on several areas that were more than a half inch wide cracks.
FBJ29124 I hung up the sanitary napkin boxes on the wall with screws in the women's restrooms. (completed)
FBJ29362 I had to re tap the holes in the frame where the screw holes were striped out and put new screws to make the door closer anchor onto the frame and it is working properly. (completed)
I checked the thermostat control through out the building and all is working with heat.
FBJ29369 The table rack needed to be worked on by pulling the nails out of the boards and pushing the boards back against the wall and I had to re-nail the bottom, center and the top to secure it to the wall. I had to pull some nails from the top cover of the table track for it to slide back in place for the top to be secured. I had to also secure the board on the far side with nails, now it is steady and secure with all tables slid into it. (completed)
Checked the pulpit control, fuse, satellite and sound system in the chapel, all is working good, no problems.
FBJ28813 I repaired several places on the sidewalks that were more than a half inch with concrete caulking. There are more issues in areas where the sidewalk is significantly lower than the curb, Debbie will get someone to grind them down level with a machine.
Worked 7.5 hours
Jeff
FBJ29124 I hung up the sanitary napkin boxes on the wall in the women's restrooms. (completed)
FBJ29362 I had to re tap the holes in the frame and put new screws to make the door closer anchor onto the frame and is working properly. (completed)
I checked the thermostat control through out the building and all is working with heat.
FBJ29369 The table rack needed to be worked on by pulling the nails out of the boards and pushing the boards back against the wall and I had to re-nail the bottom, center and the top to secure it to the wall. I had to pull some nails from the top cover of the table track for it to slide back in place for the top to be secured. I had to also secure the board on the far side with nails, now it is steady and secure with all tables slid into it. (completed)
Checked the pulpit control, fuse, satellite and sound system in the chapel, all is working good, no problems.
FBJ28813 Several places on the sidewalks that were more than a half inch were repaired with concrete caulking.