On Thursday I went to the Atlanta Temple to help Bobby and Troy to do the following work.
Troy and I went to the Temple store to finish putting the base board down on the bottom of shelves that holds the garment clothing. We also replaced a few burnt light bulbs in the store.
We had to unload a 20 foot container and load the items in back of the truck and make several trips back and forth to the dumpster to throw away all items out of the container.
Nathan went to Home Depot to get some adhesive remover so I would be able to continue to try and break down the glue, off of the concrete as you enter in front of the entrance of the Temple. Elder Chris and I continued scrapping the glue for the rest of the evening.
Worked 9 hours
Jeff
Thursday, March 31, 2011
Wednesday, March 30, 2011
03.30.11 Atlanta Temple
On Wednesday I went to the Atlanta Temple to help Bobby and Troy to do the following work.
I helped to clean and touch up the wood trim around the doors and frames with stain that had scratches and chips on them.
The rest of the day I cleaned, waxed and polished all the brass door handles in the Temple. Then I had to take the tape off around the doors after I was done cleaning and polishing the brass handles on all doors.
Worked 8 hours
Jeff
I helped to clean and touch up the wood trim around the doors and frames with stain that had scratches and chips on them.
The rest of the day I cleaned, waxed and polished all the brass door handles in the Temple. Then I had to take the tape off around the doors after I was done cleaning and polishing the brass handles on all doors.
Worked 8 hours
Jeff
Tuesday, March 29, 2011
03.29.11 Atlanta Temple
On Tuesday I went to the Atlanta Temple help Bobby and Troy to do the following work.
Nathan and I had to move the new carpet in the front door of the entrance in the Temple to the side, so the concrete could be pressure washed to try and remove the glue off of it. At the end of the day we had to lay the carpet down so people could walk back into the Temple and not step on glue.
I had to put a shelf up in the laundry room to hang mops and another shelf in the custodial closet to hang varies items.
I had to connect the VCR to the TV to play movies on it, in the room to the right of the front of the Temple.
I cleaned several door knobs and polished them with brass polish to make them shine.
I had to bring 3 large bags of trash to the dumpster to throw away.
Worked 8 hours
Jeff
Nathan and I had to move the new carpet in the front door of the entrance in the Temple to the side, so the concrete could be pressure washed to try and remove the glue off of it. At the end of the day we had to lay the carpet down so people could walk back into the Temple and not step on glue.
I had to put a shelf up in the laundry room to hang mops and another shelf in the custodial closet to hang varies items.
I had to connect the VCR to the TV to play movies on it, in the room to the right of the front of the Temple.
I cleaned several door knobs and polished them with brass polish to make them shine.
I had to bring 3 large bags of trash to the dumpster to throw away.
Worked 8 hours
Jeff
Monday, March 28, 2011
03.28.11 Atlanta Temple
On Monday I went to help Bobby and Troy at the Temple to do the following work.
I moved several boxes off the floor into medal racks to be able to clear floor space to have room to put some tables down in the mechanical room. I moved vacuum cleaners, boxes of tools, rolls of carpet and various items to clear the rest of the floor and put them into medal racks.
I was asked to pull the carpet up in the front entrance door of the Temple and it was glued to the concrete. I had to use my utility knife to cut the glue in between the carpet and concrete to get the carpet up. I had to cut it up into pieces to get it all up. I used some goof off to spray onto the concrete to be able to scrap some of the glue off of it. Then Troy and Nathan helped me to put the new carpet down in front of the entrance of the Temple.
Worked 8 hours,
Jeff
I moved several boxes off the floor into medal racks to be able to clear floor space to have room to put some tables down in the mechanical room. I moved vacuum cleaners, boxes of tools, rolls of carpet and various items to clear the rest of the floor and put them into medal racks.
I was asked to pull the carpet up in the front entrance door of the Temple and it was glued to the concrete. I had to use my utility knife to cut the glue in between the carpet and concrete to get the carpet up. I had to cut it up into pieces to get it all up. I used some goof off to spray onto the concrete to be able to scrap some of the glue off of it. Then Troy and Nathan helped me to put the new carpet down in front of the entrance of the Temple.
Worked 8 hours,
Jeff
Friday, March 25, 2011
03.25.11 Atlanta Temple and Glenridge Building
I went on Friday to help Bobby and Troy to do the following work at Atlanta Temple and Glenridge building.
Checked the lights in the chapel of the Glenridge building and no bulbs were burnt, all are working good.
Checked the thermostat controls in the Glenridge building and they are all working properly.
We had taken several typewriters, printers and other items out of the 20 foot container and loaded it into the 45 footer Allied trailer.
We had taken 3 large concrete pots from the front of the Temple, carpets from inside of the Temple and scuffles from the 20 foot container and loaded them into the Allied trailer.
We had to take several items, like the carpet cleaner, hoses, tables, ect. out of the Temple and loaded it into the Allied trailer.
We had to unload items, such as tables, chairs, boxes, ect. out of a 20 foot container and load it into the Allied trailer.
We had to unload four refrigerators out of a building from the Temple grounds and loaded them into an Allied trailer.
Worked 8 hours
Jeff

Checked the lights in the chapel of the Glenridge building and no bulbs were burnt, all are working good.

Checked the thermostat controls in the Glenridge building and they are all working properly.

We had taken several typewriters, printers and other items out of the 20 foot container and loaded it into the 45 footer Allied trailer.



We had taken 3 large concrete pots from the front of the Temple, carpets from inside of the Temple and scuffles from the 20 foot container and loaded them into the Allied trailer.



We had to take several items, like the carpet cleaner, hoses, tables, ect. out of the Temple and loaded it into the Allied trailer.



We had to unload items, such as tables, chairs, boxes, ect. out of a 20 foot container and load it into the Allied trailer.

We had to unload four refrigerators out of a building from the Temple grounds and loaded them into an Allied trailer.
Checked the lights in the chapel of the Glenridge building and no bulbs were burnt, all are working good.
Checked the thermostat controls in the Glenridge building and they are all working properly.
We had taken several typewriters, printers and other items out of the 20 foot container and loaded it into the 45 footer Allied trailer.
We had taken 3 large concrete pots from the front of the Temple, carpets from inside of the Temple and scuffles from the 20 foot container and loaded them into the Allied trailer.
We had to take several items, like the carpet cleaner, hoses, tables, ect. out of the Temple and loaded it into the Allied trailer.
We had to unload items, such as tables, chairs, boxes, ect. out of a 20 foot container and load it into the Allied trailer.
We had to unload four refrigerators out of a building from the Temple grounds and loaded them into an Allied trailer.
Worked 8 hours
Jeff
Checked the lights in the chapel of the Glenridge building and no bulbs were burnt, all are working good.
Checked the thermostat controls in the Glenridge building and they are all working properly.
We had taken several typewriters, printers and other items out of the 20 foot container and loaded it into the 45 footer Allied trailer.
We had taken 3 large concrete pots from the front of the Temple, carpets from inside of the Temple and scuffles from the 20 foot container and loaded them into the Allied trailer.
We had to take several items, like the carpet cleaner, hoses, tables, ect. out of the Temple and loaded it into the Allied trailer.
We had to unload items, such as tables, chairs, boxes, ect. out of a 20 foot container and load it into the Allied trailer.
We had to unload four refrigerators out of a building from the Temple grounds and loaded them into an Allied trailer.
Thursday, March 24, 2011
03.24.11 Glenridge Building
On Thursday I went to help Bobby to the following work in the Glenridge Church.
I originally took some of the ceiling tiles out of the Library to match the tiles in the Primary Room, then I had to measure and cut to replace the extra ones back in the Library. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in the Primary Room to fit properly. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 123, 124 and 125. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 116,117 and 118 (completed)
I replaced the ceiling tiles in room 126, 127 and 128 with new ones. I had to measure and cut the tiles to fit properly. (completed)
Worked 9 hours
Jeff



I originally took some of the ceiling tiles out of the Library to match the tiles in the Primary Room, then I had to measure and cut to replace the extra ones back in the Library. (completed)



I had to measure and cut different sizes of tiles to replace them in the ceiling in the Primary Room to fit properly. (completed)



I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 123, 124 and 125. (completed)






I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 116,117 and 118 (completed)



I replaced the ceiling tiles in room 126, 127 and 128 with new ones. I had to measure and cut the tiles to fit properly. (completed)
I originally took some of the ceiling tiles out of the Library to match the tiles in the Primary Room, then I had to measure and cut to replace the extra ones back in the Library. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in the Primary Room to fit properly. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 123, 124 and 125. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 116,117 and 118 (completed)
I replaced the ceiling tiles in room 126, 127 and 128 with new ones. I had to measure and cut the tiles to fit properly. (completed)
Worked 9 hours
Jeff
I originally took some of the ceiling tiles out of the Library to match the tiles in the Primary Room, then I had to measure and cut to replace the extra ones back in the Library. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in the Primary Room to fit properly. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 123, 124 and 125. (completed)
I had to measure and cut different sizes of tiles to replace them in the ceiling in rooms 116,117 and 118 (completed)
I replaced the ceiling tiles in room 126, 127 and 128 with new ones. I had to measure and cut the tiles to fit properly. (completed)
Wednesday, March 23, 2011
03.23.11 Glenridge Building
On Wednesday I went to the Glenridge Building to assist Bobby to do the following work in the building.
I took the ceiling tiles out of room 126, 127 and 128 to place them in other rooms that will match the tiles I took out. The new ceiling tiles will go into these rooms tomorrow.
I had to patch holes in the ceiling tiles in the hallway and a few rooms. The rooms 123, 124 and 125 I pulled the old bad ceiling tiles out and replaced them with the tiles I took out of the other rooms to match them.
I went to Home Depot to pick up the new ceiling tiles to put them in the rooms 126, 127 and 128 for tomorrow.
Worked 9 hours
Jeff













I had to patch holes in the ceiling tiles in the hallway and a few rooms.







I took the ceiling tiles out of room 126, 127 and 128 to place them in others that will match the tiles I took out. The new ceiling tiles will go into these rooms tomorrow.

I went to Home Depot to pick up the ceiling tiles.
I took the ceiling tiles out of room 126, 127 and 128 to place them in other rooms that will match the tiles I took out. The new ceiling tiles will go into these rooms tomorrow.
I had to patch holes in the ceiling tiles in the hallway and a few rooms. The rooms 123, 124 and 125 I pulled the old bad ceiling tiles out and replaced them with the tiles I took out of the other rooms to match them.
I went to Home Depot to pick up the new ceiling tiles to put them in the rooms 126, 127 and 128 for tomorrow.
Worked 9 hours
Jeff
I had to patch holes in the ceiling tiles in the hallway and a few rooms.
I took the ceiling tiles out of room 126, 127 and 128 to place them in others that will match the tiles I took out. The new ceiling tiles will go into these rooms tomorrow.
I went to Home Depot to pick up the ceiling tiles.
Subscribe to: