Checked the thermostat control through out the building and they were working properly with heat.
I had to reset the time on four of clocks and change the battery in one.
I had to adjust the strike plate on the door in the back of the church for it close tighter and all other doors were closing properly.
Checked all the classroom tables and tightened the screws on the legs as needed.
I had to tighten one of the screws to the changing table to the wall and the other one was good and tight. Also flushed all the toilets in the restrooms and they were all flushing without any problems or leaks.
The key was very hard to open the door going outside of the RS room, so I had to take the cover off and lubricate the lock and put the cover back on the door. It is now working properly.
FBJ 29515 I debugged the outside shed and mechanical room with foggers to get rid of the insects. (completed)
Checked the appliances in the serving area, the stove, refrigerator and microwave and all are working good. A few of the kitchen cabinets were not latching properly, so I had to adjust the magnet catchers on them to pull the door tight for it to close.
Checked the outside parking lot lights and had to change one bulb in the number 4 pole, all others are good.
Checked all the lights through out the building, no burnt bulbs were found and all are working properly.
FBJ29529 Tested and verified the emergency ballasts were installed - Eclect. (completed)
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all are working and sound good.
FBJ28814 Continued caulking several gaps in the sidewalk that were greater than a half inch wide with concrete caulking.
Worked 8 hours
Jeff
Checked the thermostat control through out the building and they were working properly with heat.
I had to reset the time on four of clocks and change the battery in one.
I had to adjust the strike plate on the door in the back of the church for it close tighter and all other doors were closing properly.
Checked all the classroom tables and tightened the screws on the legs as needed.
I had to tighten one of the screws to the changing table to the wall and the other one was good and tight.
The key was very hard to open the door going outside of the RS room, so I had to take the cover off and lubricate the lock and put the cover back on the door. It is now working properly.
FBJ 29515 I debugged the outside shed and mechanical room with foggers to get rid of the insects. (completed)
Checked the appliances in the serving area, the stove, refrigerator and microwave and all are working good.
Checked the outside parking lot lights and had to change one bulb in the number 4 pole, all others are good.
Checked all the lights through out the building and all are working properly.
FBJ29529 Tested and verified the emergency ballasts were installed - Eclect. (completed)
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all are working and sound good.
FBJ28814 Continued caulking several gaps in the sidewalk that were greater than a half inch wide with concrete caulking.