On Wednesday I went to the Dallas building to do the following work and maintenance.

Checked all thermostat controls in the building and they were all working with heat.

Checked all clocks in the building and had to reset one of them to the correct time.

The toilet bowl flush valve in the women's restroom had to be replaced, the water was leaking into the toilet. There was an extra one in the shed for it to be replaced.

Checked all the toilet paper holders and tighten them as needed. One of them had a loose side and I had to take it off and tighten the bracket to the wall and put the end back on it to tighten it also.

Tested all the outlets through out the building, no problems were found and all were working properly.

I had to tighten the loose screws on the door hinges, so it would close properly.

Finish painting the wall above the water fountain that I had installed a few weeks ago.

I had to adjust the strike plate on the door for it to close tighter and checked all others in the building and they are working properly.

The high lights in the Cultural Hall had two bulbs burnt and the other one had one bulb burnt and I replaced them and they are now all working properly.

Checked the lights in the hallway and in the attic and all were working good.

Checked the pulpit control, fuse, satellite and sound system in the chapel, all are working properly.

FBJ29527 The fire extinguisher was moved the last time I went to this building. (completed)

Worked 8 hours

Jeff








Checked all thermostat controls in the building and they were all working with heat.



Checked all clocks in the building and had to reset one of them to the correct time.





The toilet bowl flush valve in the women's restroom had to be replaced, the water was leaking into the toilet.




Checked all the toilet paper holders and tighten them as needed. One of them had a loose side and I had to take it off and tighten the bracket to the wall and put the end back on it to tighten it also.



Tested all the outlets through out the building, no problems were found and all were working properly.




I had to tighten the loose screws on the door hinges, so it would close properly.




Finish painting the wall above the water fountain that I had installed a few weeks ago.




I had to adjust the strike plate on the door for it to close tighter and checked all others in the building and they are working properly.









The high lights in the Cultural Hall had two bulbs burnt and the other one had one bulb burnt and I replaced them and they are now all working properly.





Checked the lights in the hallway and in the attic and all were working good.



FBJ29527 The fire extinguisher was moved the last time I went to this building. (completed)