On Tuesday I went to help Bobby to do the following work orders and other projects in the building.

Checked the thermostat controls in the building and all were working properly.

I had to change the light bulb in the hallway that was burnt.

FBJ29536 I had to put a new bulb and cover on the light fixture in the women's restrooms. (completed)

FBJ29537 I had to scrap and sand the wood down on the outside shed to get it ready to be painted. I painted the wood trim on the outside of the shed door and also bombed the shed for bugs. (completed)

I had to change several ceiling tiles in the different rooms, numbers 116, 117, 118, 123, 124, 125, 126,127 and 128. Several ceiling tiles were replaced in the Primary room also.

Worked 9 hours

Jeff








Checked the thermostat controls in the building and all were working properly.




I had to change the light bulb in the hallway that was burnt.






FBJ29536 I had to put a new bulb and cover on the light fixture in the women's restrooms. (completed)






FBJ29537 I had to scrap and sand the wood down on the outside shed to get it ready to be painted. I painted the wood trim on the outside of the shed door and also bombed the shed for bugs. (completed)







I had to change several ceiling tiles in the different rooms, numbers 116, 117, 118, 123, 124, 125, 126,127 and 128. Several ceiling tiles were replaced in the Primary room also.