I went to Rome to do the following work orders and maintenance in the building.

Checked the thermostat controls in the building and they are working properly with heat.

FBJ29463 I brought a part for a vacuum cleaner from Cartersville to repair the one in Rome. I checked both of them in the building and they are working properly.

FBJ29361 I changed out the bulb on the parking lot light for pole 4. (completed)
FBJ29386 SKip Mullis repaired the pole lights and put them on a photocell. (completed)
FBJ29403 Skip Mullis repaired the problems with the pole light issues. I covered the photocell to check the parking lot lights to see if they were working and they all came on. (completed)

Checked and listened to the indoor and outside units for any abnormal condition and they all sounded good.

Checked all the clocks for the proper times and all were set correctly.

Did a walk around the building outside and the grass was mowed, edges, trees and shrubs all looked trimmed and neat.

Had to adjust the strike plate for the door to close tight and properly. Checked all other doors in the building and no problems were found.

Checked the cultural hall, chapel and other lights throughout the building and all are working properly.

The toilet was leaking and I had to change the flushing valve in the women's restroom. All other plumbing in the building were working properly, no leaks were found.

Replaced the middle piece of the toilet paper holder that was missing and tightened the screws that were loose.

Tightened the screws on the changing table and checked all others in the building.

Checked and lubricated the pulpit control and checked the fuse, satellite and sound system, all sounded good.

The vent was not fitting tight on the floor and I had move the vent up and bend the medal inside the vent for it be flat on the floor.

Worked 8 hours

Jeff








Checked the thermostat controls in the building and they are working properly with heat.




FBJ29463 I brought a part for a vacuum cleaner from Cartersville to repair this one in Rome.




FBJ29361 I changed out the bulb on the parking lot light for pole 4. (completed)
FBJ29386 SKip Mullis repaired the pole lights and put them on a photocell. (completed)
FBJ29403 Skip Mulllis repaired the problems with the pole light issues. I covered the photocell to check the parking lot lights to see if they were working and they all came on. (completed)




Checked and listened to the indoor and outside units for any abnormal condition and they all sounded good.




Checked all the clocks for the proper times and all were set correctly.






Did a walk around the building outside and the grass was mowed, edges, trees and shrubs all looked trimmed and neat.




Had to adjust the strike plate for the door to close tight and properly.




Checked the cultural hall and the chapel lights and all are working properly.




The toilet was leaking and I had to change the flushing valve in the women's restroom.




Replaced the middle piece of the toilet paper holder that was missing and tightened the screws that were loose.




Tightened the screws on the changing table and checked all others in the building.




Checked and lubricated the pulpit control and checked the fuse, satellite and sound system, all sounded good.




The vent was not fitting tight on the floor and I had move the vent up and bend the medal inside the vent for it be flat on the floor.