Wednesday, March 16, 2011

03.16.11 Douglasville

Went to Douglasville on Wednesday to do the following work and maintenance in the building.

I went to Lowes to purchase the bug bombs to bomb the shed and mechanical buildings outside for all buildings I do maintenance work. I also purchased other items: finishing nails, rope to repair the stage curtain in Acworth and caulking to repair around the sinks, toilets and splash boards as needed for next time I go to these building to do work.

Checked the thermostat controls in the building and all are working good with heat.

Tested the outside parking lot lights and all came on and are working properly.

Checked all the clocks and only had to reset one of them to the correct time.

There was a leak on the drain pipe and I had to repair on the water fountain in the hall way.

Checked all lights through the building including the attic and all are working properly.

The emergency lights in the cultural hall and hall way were working properly. I also had to straighten the frame around the emergency lights in the cultural hall.

The appliances in the serving area were all working properly, found no problems with the oven, refrigerator and microwave.

In the cultural hall two of the basketball nets were tore up and I replaced them with new ones.

In the cultural hall two of the vents was clogged up with dust and lint and I took them out to be cleaned.

The changing tables were all good and tight to the wall in the restrooms.

All the outlets in the building tested good, no problems.

Checked all classroom tables through out the building and tightened the legs as needed.

Lubricated the pulpit control and checked the fuse, satellite and sound system all is working good.

Bug Bombed the Boy Scout and Supply sheds outside the building.

Worked 8 hours

Jeff







Checked the thermostat controls in the building and all are working good with heat.




Tested the outside parking lot lights and all came on and are working properly.



Checked all the clocks and only had to reset one of them to the correct time.




There was a leak on the drain pipe and I had to repair on the water fountain in the hall way.






Checked all lights through the building including the attic and all are working properly.





The emergency lights in the cultural hall and hall way were working properly. I also had to straighten the frame around the emergency lights in the cultural hall.





The appliances in the serving area were all working properly, found no problems with the oven, refrigerator and microwave.





In the cultural hall two of the basketball nets were tore up and I replaced them with new ones.




In the cultural hall two of the vents was clogged up with dust and lint and I took them out to be cleaned.




The changing tables were all good and tight to the wall in the restrooms.



All the outlets in the building tested good, no problems.




Checked all classroom tables through out the building and tightened the legs as needed.




Lubricated the pulpit control and checked the fuse, satellite and sound system all is working good.




Bug Bombed the Boy Scout and Supply sheds outside the building.