I replaced two locks on the cabinet doors in the RS. room.
In room 102 had to sand down the wall and I cleaned it and painted a few spots on the wall.
I checked the lights in the chapel. I had to use a ladder to get to the top to change four 4 foot fluorescent light bulbs. The other lights in the cultural hall and hall ways were working good.
In the mechanical room there was a few spots of paint peeling on the floor. I had to scrape the paint and sand it down, then cleaned it and repainted the floor.
Rooms 105 I had to change a ceiling tile with a vent and 4 other tiles and 111 I had to change one ceiling tile with a vent.
I lubricated the pulpit control and checked the sound system and satellite, everything sounds good.
In the men's restroom I had to take the handle off the door to tighten the screws and put it back on for the handle to be secured.
Worked 8 hours,
Jeff
I replaced two locks on the cabinet doors in the RS. room.
In room 102 had to sand down the wall and I cleaned it and painted a few spots on the wall.
I checked the lights in the chapel. I had to use a ladder to get to the top to change four 4 foot fluorescent light bulbs. The other lights in the cultural hall and hall ways were working good.
In the mechanical room there was a few spots of paint peeling on the floor. I had to scrape the paint and sand it down, then cleaned it and repainted the floor.
Rooms 105 I had to change a ceiling tile with a vent and 4 others and 111 I had to change one ceiling tile with a vent.
I lubricated the pulpit control and checked the sound system and satellite, everything sounds good.
In the men's restroom I had to take the handle off the door to tighten the screws and put it back on for the handle to be secured.