Tuesday, December 13, 2011

12.13.Newnan

On Tuesday I went to Newnan to do the following maintenance work in the building.

I replaced two locks on the cabinet doors in the RS. room.

In room 102 had to sand down the wall and I cleaned it and painted a few spots on the wall.

I checked the lights in the chapel. I had to use a ladder to get to the top to change four 4 foot fluorescent light bulbs. The other lights in the cultural hall and hall ways were working good.

In the mechanical room there was a few spots of paint peeling on the floor. I had to scrape the paint and sand it down, then cleaned it and repainted the floor.

Rooms 105 I had to change a ceiling tile with a vent and 4 other tiles and 111 I had to change one ceiling tile with a vent.

I lubricated the pulpit control and checked the sound system and satellite, everything sounds good.

In the men's restroom I had to take the handle off the door to tighten the screws and put it back on for the handle to be secured.

Worked 8 hours,

Jeff












I replaced two locks on the cabinet doors in the RS. room.






In room 102 had to sand down the wall and I cleaned it and painted a few spots on the wall.













I checked the lights in the chapel. I had to use a ladder to get to the top to change four 4 foot fluorescent light bulbs. The other lights in the cultural hall and hall ways were working good.






In the mechanical room there was a few spots of paint peeling on the floor. I had to scrape the paint and sand it down, then cleaned it and repainted the floor.














Rooms 105 I had to change a ceiling tile with a vent and 4 others and 111 I had to change one ceiling tile with a vent.







I lubricated the pulpit control and checked the sound system and satellite, everything sounds good.





In the men's restroom I had to take the handle off the door to tighten the screws and put it back on for the handle to be secured.

No comments:

Post a Comment