On Wednesday I went to Newnan to do the following work in the building that needed to be painted.

I had to go to Sherwin Williams to purchase the right paint for the font area, super glue and a couple of sand blocks.

I had to put a semi gloss second coat of paint in the font area around the water valves. Once the paint was dried I put the cover back on water valve box.

In room 105 I had to sand the sheetrock where I had mudded yesterday. A few spots needed to be re mudded because they had sunk in. I wiped all the walls down to clean in the room and vacuumed the carpet to get the dust out. I had to trim out using the paint brush around the windows, door, corners, caulk board, receptacles, thermostat, exit sign and around the wood trim on the walls. I used the roller to finish painting the room to complete it.

worked 8 hours,

Jeff









I had to put a semi gloss second coat of paint in the font area around the water valves. Once the paint was dried I put the cover back on water valve box.


















In room 105 I had to sand the sheetrock where I had mudded yesterday. A few spots needed to be re mudded because they had sunk in. I wiped all the walls down to clean in the room and vacuumed the carpet to get the dust out. I had to trim out using the paint brush around the windows, door, corners, caulk board, receptacles, thermostat, exit sign and around the wood trim on the walls. I used the roller to finish painting the room to complete it.