I checked the lights in the hallway and had to replace a few four foot fluorescent and several round bulbs that were burnt.
I checked the exterior doors through out the building and I had to adjust one of the strike plates on the door for it to shut good and tight. All other doors were shutting properly.
FBJ31968 I installed the stair sign for the upstairs in the hallway. I had to measure up from the floor to get the proper height and width from the corner to get the center of the sign installed properly. (completed) 9:00 to 9:45
FBJ32467 I replaced the missing washer with the nut that was holding the seat on the frame with the legs to repairs a few of the chairs in the RS room. The feet were not broken, the nut came off of the seat and it was loose because the bolt was missing. I checked all other chairs in the room and they were good. (completed) 11:00 to 12:00
FBJ29513 I bug bombed the outside shed. I had to unlock the door and I put one bomb in the front and back, then shut the shed door and locked it. (completed) 1:00 to 1:20
FBJ31992 I replaced the missing ceiling tile in the bishop's office. I had to cut out a piece of ceiling tile for the one that was missing. I had to go upstairs to find the ceiling tile and then go back downstairs to measure the size of the hole to cut the proper measurements. (completed) 1:00 to 2:30
There was a four foot fluorescent light that was burnt in the women's restroom that I had to replace.
Worked 8 hours,
Jeff
I checked the lights in the hallway and had to replace a few four foot fluorescent and several round bulbs that were burnt.
I checked the exterior doors through out the building and I had to adjust one of the strike plates on the door for it to shut good and tight. All other doors were shutting properly.
FBJ31968 I installed the sign for the upstairs in the hallway. (completed)
FBJ32467 I replaced the missing washer with the nut that was holding the seat on the frame with the legs to repairs a few of the chairs in the RS room. I checked all other chairs in the room and they were good. (completed)
FBJ29513 I bug bombed all the outside sheds. (completed)
FBJ31992 I replaced the missing ceiling tile in the bishop's office. I had to cut out a piece of ceiling tile for the one that was missing. (completed)
There was a four foot fluorescent light that was burnt in the women's restroom that I had to replace.