Tuesday, January 3, 2012

01.03.12 Newnan

On Tuesday I went to Newnan to do the following work to prep the rooms for painting in the building.

In room 105 I taped around the wood trim and the top by the ceiling, to get ready for painting.

I had to take the cover off where the valves are located that fills the font, so I could mud around it to repair it, had to let it dry and then I painted it. Tomorrow I will have to put a second coat of paint around it.

I noticed in the men's restroom one of the toilets that had been used was out of order. I had to put a new flush handle on it to repair it and now it is flushing properly.

In room 105 I had to do a lot of touch of mudding all around the room. Before I could mud the room I had to sand the sheet rock down to get the walls smooth. Then wipe them down clean to get the dust off and vacuum the carpet. I had to take all the pictures off the walls to prepare to paint it.

worked 7 hours,

Jeff










In room 105 I taped around the wood trim and the top by the ceiling, to get ready for painting.








I had to take the cover off where the valves are located that fills the font, so I could mud around it to repair it, let it dry and then I painted it.







I noticed in the men's restroom one of the toilets that had been used was out of order. I had to put a new flush handle on it to repair it and now it is flushing properly.













In room 105 I had to do a lot of touch of mudding all around the room. Before I could mud the room I had to sand the sheet rock down to get the walls smooth. Then wipe it down clean to get the dust off and vacuum the carpet.

No comments:

Post a Comment