Monday, October 31, 2011

10.31.11 Newnan

On Monday I went to Newnan to do the following maintenance in the building.

In the 4th room of the mechanical room I finished wiping and dusting the heaters, pipes and spider webs. I had to sweep and vacuum the floor and cleaned it with the cleaning solution, then mopped it real good. Then I sealed it with the bonding prime and by tomorrow it will be dry and ready for painting.

In the first room I trimmed out using a paint brush around the pipes, heaters and duct vents. I had to crawl in between the heaters and it was very time consuming. I used a roller to complete painting the rest of the floor in the mechanical room.

In the second room I trimmed out using a paint brush around the pipes, heaters and duct vents. I had to crawl in between the heaters which was a small area to paint and it was very time consuming. I used a roller to complete the painting of the rest of the floor in the mechanical room.

Worked 8 hours,

Jeff










In the 4th room I finished wiping and dusting the heaters, pipes and spider webs. I had to sweep and vacuum the floor and cleaned it with the cleaning solution, then mopped it real good.








In the first room I trimmed out using a paint brush around the pipes, heaters and duct vents. I had to crawl in between the heaters and it was very time consuming. I used a roller to complete painting the rest of the floor in the mechanical room.






In the second room I trimmed out using a paint brush around the pipes, heaters and duct vents. I had to crawl in between the heaters which was a small area to paint and it was very time consuming. I used a roller to complete the painting of the rest of the floor in the mechanical room.

No comments:

Post a Comment