FBJ13599 This is about resurfacing the floor not needed and can be took off the work order. (complete)
Checked the pulpit control and fuse and sound system and satellite, all is working good. (complete)
Patched the cracks with joint compound in the hallway over a door. (completed)
FBJ13614 The vent and back of the shed needs a new vent, I will go to home depot and get one for it and a gallon of yellow paint for the posts. (incomplete)
In the men's restroom someone turned off the water on the toilet and I turned the water back on and it is working good, no leaks. (completed)
Checked all the HVAC systems and all are working good and heating good. (completed)
Changed two new light bulbs in the women's restroom. (completed)
worked 8 hours
jeff
FBJ13599 This is about resurfacing the floor not needed and can be took off the work order. (complete)
Checked the pulpit control and fuse and sound system and satellite, all is working good. (complete)
Patched the cracks with joint compound in the hallway over a door. (completed)
FBJ13614 The vent and back of the shed needs a new vent I will go to home depot and get one for it and a gallon of yellow paint for the posts. (incomplete)
In the men's restroom someone turned off the water on the toilet and I turned the water back on and it is working good, no leaks. (completed)
Checked all the HVAC systems and all are working good and heating good. (completed)
Changed two new light bulbs in the women's restroom. (completed)