Touched up some woodwork on the doors of the classrooms with stain in the hallway, they had scratches and chips on the bottom. (completed)
Touched up some woodwork with stain on the step of the chapel, there was scratches on the edges. (completed)
Checked the pulpit control, the fuse, satellite and sound system and all are working good. (completed)
Checked the tables in the classrooms and had to tighten the screws on all of the legs as needed. (completed)
Checked all 4 vacuum cleaners and they all are working good. (completed)
Adjusted the strike plate for the door to shut properly. (Completed)
I had to drill two new holes in the frame to adjust the strike plate for the door to shut properly. (completed)
Checked the attic lights and all are working properly. (Completed)
FBJ13647 The 3-way switch for the font area lights still has not been done by ABG. Someone may need to contact them again about the status of the work that has not been done. (not completed)
Worked 8 hours
Jeff
Touched up some woodwork on the doors of the classrooms with stain in the hallway. (completed)
Touched up some woodwork with stain in the chapel. (completed)
Checked the pulpit control, the fuse, satellite and sound system and all are working good. (completed)
Checked the tables in the classrooms and had to tighten the screws on all of the legs as needed. (completed)
Checked all 4 vacuum cleaners and they all are working good. (completed)
Adjusted the strike plate for the door to shut properly. (Completed)
I had to drill two new holes in the frame to adjust the strike plate for the door to shut properly. (completed)
Checked the attic lights and all are working properly. (Completed)
FBJ13647 The 3-way switch for the font area lights still has not been done by ABG. (not completed)