Friday, December 17, 2010

12/17/10 Mars Hill

I went to Mars Hill on Friday to do the following maintenance and work orders in the building.

Checked for water leaks, on all the plumbing through out the building and found no leaks. (completed)

FBJ13643 Repaired the cracks in the corners in the primary room with drywall. (completed)

Checked the pulpit control and fuse, satellite and sound system and all was good. (completed)

FBJ13638 Repaired the corner trim behind the sacrament table and I also had to putty and paint it. (completed)

FBJ13643 Repaired the expansion joints in Relief Society room and corners. (completed)

FBJ13642 Repaired the drywall around the light switch in room 106. (completed)

Put a new door stop on the wall in room 104. (completed)

Checked all temperature controls and they were working good. (completed)

FBJ13641 Screw popped out of the wall in room 104, I packed the screw hole with drywall. (completed)

FBJ13647 I checked to see about the 3-way switch for the font area lights and the work order stated that ABG should have done it by the end of next week, the date of 11/19/10. It still has not been done. (not completed)

Worked 8 hours

Jeff




Checked for water leaks, no leaks. (completed)




JBJ1364 Repaired the cracks in the corners in the primary room with drywall. (completed)





Checked the pulpit control and fuse, satellite and sound system and all was good. (completed)



FBJ13638 Repaired the corner trim behind the sacrament table and I also putted and painted it. (completed)




FBJ13643 Repaired the expansion joints in Relief Society room and corners. (completed)




FBJ13642 Repaired the drywall around the light switch in room 106. (completed)




Put a new door stop on the wall in room 104. (completed)



Checked all temperature controls and they were working good. (completed)




FBJ13641 Screw popped out of the wall in room 104, I packed the screw hole with drywall. (completed)