FBJ13641 Patched the holes with drywall in the wall that two screws popped out of in room 104. (completed)
FBJ13642 I had to remove the switch cover to patch the wall around the light switch in room 106 with drywall. Then I had to screw the cover back on. (completed)
Checked the lights in the attic and they are all working good. (completed)
Checked the smoke detector and it is working good. (completed)
The fire alarm system checked normal. (completed)
Checked the fire extinguishers through out the building and in the attic and they are all fully charged. Signed and dated the cards. (completed)
I received a call from Chris Curby and he came and met me in Kennesaw. We went to Stockbridge to do the following work. The marble sign with the name of The church of Jesus Christ of Latter Day Saints on it had to be removed. We had to break the bricks around it and chip the martor to get the sign out and we loaded it on my truck and put it in the shed. (completed)
FBJ28755 The last time I was in this building the ceiling tile was missing in the cultural hall and I noticed that someone completed the work. (completed)
Worked 8 hours
Jeff
FBJ13641 Patched the holes in the wall that two screws popped out of in room 104. (completed)
FBJ13642 Patched the wall around the light switch in room 106 with drywall. (completed)
Checked the lights in the attic and they are all working good. (completed)
Checked the smoke detector and it is working good. (completed)
The fire alarm system checked normal. (completed)
Checked the fire extinguishers through out the building and in the attic and they are all fully charged. (completed)