Wednesday, October 13, 2010

10/13/10 - Mars Hill Worked Completed

On Wednesday I went to Kennesaw.

A sign was installed on the door for the men and women's restrooms in the font area. The same height and position as other signage.

Touch up stain on woodwork was done on the corner wall before going to the chapel, on the double door in the culture hall
and on room 109.

The strike plate was adjusted to the back door of the church, the other double door hinges to the back of the church, the front door and the hinges, on the side door of the church and I also drilled new holes in the door frame to readjust it, these were all done for them to lock properly.

As you walk through the side of the church with 3 doors and turn to the right and look to the left there was a hole on the wall that was patched, but it did not get painted yet. The putty needs to dry and a second coat needs to be applied before painting.

Checked the HVAC and all the lights and found no problems, everything worked good.

Worked 8 hours to compete all work.

Jeff