On Monday I went to Jonesboro to pick up two new toy cabinets and one chalkboard still in the boxes located in the Family History Center.
I delivered the two toy cabinets to Decatur to put them together. I was able to put together one cabinet and placed it in the Primary Room. The other one had a broken hinge and I placed it in the closet next to the material room. I called Ms. Mary to make a claim on the cabinet. Left one set of keys for the cabinet on the Bishop's desk with a note.
Checked the piano in the Primary room for keys sticking. The keys were not sticking, they were working good.
I delivered the chalkboard to Tucker to put together. After opening the box I noticed it was damaged, so I placed it in the outside shed. I called Ms. Mary to make a claim on it.
I had to make a few phone calls to the FM workers to find out who to call to make a claim on broke items.
The time did not allow me to complete the following work orders as stated below.
FBJ13584 Evaluate and finish installing and painting insulation on outside condenser lines as needed.
FBJ28625 Verify all HVAC systems are operational.
Assist Chris Carter with changing high lights in the chapel and cultural halls.
Check sound system/Satellite system
Assist with organization of storage areas
As time permits check door closers and hardware and touch up door and trim stain.
Worked 8 hours today.
Jeff