10/15/10 Dallas Work Completed

On Friday we went to Dallas.

The high light in the entrance way of the building was not working. An extension ladder was used to replace the bulb and touch up the paint around the fixture.

Installed (2) 2x4s with screws for a wall stop for the accordion doors on both sides of the cultural hall to shut properly.

The ballast in the hall way in the back of the building was not working and was replaced and is working good.

The light on the ceiling near the entrance way on the right side was not working and a new ballast needs to be ordered to replace it.

The strike plates on the double doors on the right side of the building was adjusted for the doors to shut tight and now is working properly.

The strike plate on the front door was adjusted and now is working properly.

The strike plates on the double doors on the left side of the building was adjusted for the doors to shut tight and now is working properly.

Worked 8 hours today.
Jeff