Friday, October 29, 2010

10/29/10 Marietta

On Friday I went to Marietta to the Cunningham Branch to perform the following work orders.

28589 Installed a new tithing slip holder by the clerk's office. (completed)

The clerk's office door was not closing all the way for it to lock, had to adjust and file the strike plate for the door to shut properly. (completed)

FBJ28800 The keys in the clerk's office did not fit any of the closet door locks in the rooms (A thru D series) in the building. (not completed)
I called Chris Carter to let him know the situation about the keys and he said he would get in touch with the Bishop about the problem. I was asked to complete the day with other work through out the building that needed to be done.
W-D40 was sprayed into the lock of the doors (A1), (A4), (B3), (B4), (C2), (C4), (D3) and (D6) to be lubricated. (completed)

Adjusted the closer on the cylinder to allow the doors to shut tight in the Relief Society room. (completed)

The primary room had a burnt light bulb and was replaced with a new fluorescent light bulb. (completed)

Tightened the outlet cover and put child proof plugs into the receptacle in the nursery room. (completed)

Touched up a few doors with stain in the hallway and the chapel doors as needed. (completed)

Worked 8 hours

Jeff






28589 Removed the old tithing slip holder and installed a new one. (completed)



Adjusted and filed the strike plate to make the door shut properly.



FBJ28800 The keys in the clerk's office did not fit any of the closet door locks in the rooms (A thru D series) in the building. I lubricated doors (A1), (A4), (B3), (B4), (C2), (C4), (D3) and (D6). (not completed)





Adjusted the closer on the cylinder to allow the doors to shut tight. (completed)




Replaced a burnt fluorescent light bulb. (completed)




Tightened the outlet cover and put child proof plugs into the receptacle. (completed)







Touched up a few doors with stain in the hallway and the chapel doors as needed. (completed)