On Thursday went to Cedartown to perform the following work.
FBJ28751 Checked all exit doors for proper function and the door in the kitchen needs a new lock.
Put together new toy cabinet and placed it in the primary room. The keys and a note was left in the branch presidents office stating, "A new toy cabinet has been placed in the primary room".
Checked all plumbing fixtures in the building. In the men's restroom the plumbing fixture covers needed to be adjusted against the wall and the water valve was tightened.
Tested outlets through out the building with the voltage meter and all were working good. Also tightened the recepticals and covers as needed.
Checked HVAC systems for proper operation through out the building and all were working properly.
Checked lights for proper operation through out the building and the ballast and 2 bulbs were changed in the cultural hall.
Checked through out the building for touch up wood work. Next to the cultural hall in the hallway the double doors and the other door were chipped at the bottom and were touched up with stain.
Worked 8 hours to complete work.
Jeff