On Thursday I was on my way to Atlanta and received a phone call to go to Dallas to pick up the new clock that needed to be replaced in the Atlanta Chapel and a tithing slip holder that is needed in the Cunningham branch for tomorrow.
28767 The new clock was installed in the chapel with a new battery. (completed)
28788 Install inspection card holder in the elevator was not done. The card holder needs to be ordered. (not completed)
28765 The chairs had to be unstacked in the chapel for them to get touched up with stain. The chairs needed to be stained on the four legs, the back and the sides. After the stain was dry they were re-stacked back against the wall in the chapel. Time allowed me to get about 55 done and less than half not completed.
The four doors in the chapel were touched up with stain, had scratches and chips. (completed)
28763 The man lift was not in the building for the trim and speakers to be repaired in the cultural hall and chapels as needed. (not completed)
Worked 8 hours
Jeff