On Wednesday I went to Dallas and worked by myself and was not able to use the man lift, to replace lights in the cultural hall and chapel as needed. (not completed)
Adjusted the strike plates on the outside doors through out the building to close properly. Also tightened up all the locks on the doors as needed. (completed)
13595 Joint compound was used to patch the wall around the light plate in room 104. The wall was sanded after the joint compound was dry at the end of the day. (completed)
13605 The glass on the fire extinguishers were not replaced. I found some glass in the shed, but it was not the correct size to fit. Need glass for both fire extinguishers, the size to order is 6" Wide X 20.5" Long. (not completed)
Checked and tested the outlets through out the building and tightened the cover as needed. (completed)
Checked the thermostats through out the building and all were working good. (completed)
Time allowed, so I touched up a few doors with stain that had scratches and chips. (completed)
Worked 8 hours
Jeff