Thursday, October 14, 2010

10/14/10 - Douglasville Work Completed

On Thursday Chris and I did a walk through the Church building in Douglasville.

Installed 6 door stops on the walls through out one side of the building. Had to measure the distance between each door and wall before installing the doorstops, so the handle would not hit the wall.

Checked the water flow on the water fountains and the lower fountain was working properly, but the higher fountain's water was not flowing as high as it should. It could not be adjusted any higher.

Checked the volts on all the switches on the circuit breaker box and the system worked good, no problems.

Had to put shims behind 6 of the electrical outlets, so the cover would fix properly and tight.

Checked all the high lights in the culture hall and were all working good, no problems.

Installed a new switch for the lights to work upstairs in the back room, cover was put back on after the switch was installed.

Jeff