FBJ28780 Needed to evaluate the Relief Society's locks to repair or replace them. We could not find the keys. Chris said he would call Mrs. Mary later to find out where the keys are located. (not completed)
Time allowed us to do other work through out the building as needed.
Touched up woodwork on seven of the doors with stain in the building, they had scratched and chips. (completed)
Installed about 10 new floor tiles in the custodian closet. (completed)
Cleaned out the gutters on the church building. Also inspected the roof for leaks and found no problems. (completed)
Replaced a new door stop on the outside of the cultural hall door. (completed)
Patched up a couple of holes on the wall in the men's restroom. (completed)
FBJ28845 Repaired three loose thresholds in the cultural hall. I had to pull them up to put new anchors down in the floor for it to tighten down properly. (completed)
FBJ28816 Replaced faulty emergency lights in the hallway. I had to remove the old lights and threw them away. (completed)
Worked 8 hours
Jeff
Touched up woodwork on seven doors with stain through out the building. (completed)
Installed about 10 new floor tiles in the closet. (completed)
Cleaned out the gutters on the church building. (completed)
Replaced a new door stop. (completed)
FBJ28845 Repaired three loose thresholds in the cultural hall. (completed)
Patched the holes on the wall in the men's restroom. (completed)
FBJ28816 Replaced faulty emergency lights in the hallway. (completed)