On Wednesday Chris and I went to Dallas to perform the following work orders.

FBJ13605 Chris was not able to purchase the new glass for the fire extinguishers at Home Depot. He will have to look for it at another supply store and purchase it at a later time. (Not completed)

Took the hardware and legs off 8 old tables to keep them for spare parts and threw the table tops in the dumpster. Eight new tables were taken out of the boxes to be inspected, no damage was found. The cardboard boxes were thrown in the dumpster. The new tables were put inside of the cultural hall closet. (completed)

FBJ13595 Patched the walls in rooms 102, 103 and 104 at the light switches with joint compound and touched them up with paint. (completed)

A total of 8 fluorescent light bulbs were changed in 3 separate lights using the man lift in the cultural hall. (completed)

Patched a hole in the sheetrock with joint compound in the serving area. I need to apply one more coat of joint compound and let it dry before it can be painted. (Not completed)

Touched up the woodwork on the double doors with stain in the chapel, they had a few scratches. (completed)

Worked 8 hours

Jeff





Took the hardware and legs off 8 old tables to keep them for spare parts and threw the table tops in the dumpster. (completed)


Took 8 new tables out of the box and inspected them, no damage was found. (completed)








FBJ13595 Patched the walls at the light switches with joint compound and touched them up with paint. (completed)




A total of 8 fluorescent light bulbs were changed in the lights in the cultural hall. (completed)




Patched a hole in the sheetrock with joint compound in the serving area. I need to apply one more coat of joint compound and let it dry before it can be painted. (Not completed)




Touched up the woodwork on the double doors with stain in the chapel . (completed)