Checked the thermostats and all the HVAC systems and they are working properly. (completed)
FBJ28715 Checked phone lines in stake office to see if they are working, the Jonesboro side is working properly, but the other side of the building I am not sure what the problem is. (not completed)
FBJ28722 Investigated the unusual smell in the Jonesboro bishop's office, the musty smell seemed to be coming from the carpet. I sprayed lysol on the carpet, wiped down the window seal with a soapy rag and emptied the trash can. Let see if the smell comes back and if it does we may have to revisit the situation.
FBJ28829 Install door stops on family history center; did not have one to install. (not completed)
FBJ28844 and FBJ28859 Checked motion sensors for proper operation throughout the building and all is working properly. (completed)
FBJ28854 Repaired the damaged new white board and also two other boards. I had to drill 2 new holes to anchor the braces on each side of the bar to secure them to the frame of the white boards. (completed)
FBJ28860 Checked a few of the LCD projectors and they were working good. (completed)
FBJ28865 Repaired the light in the baptism font. I had to replace the light with a new bulb. (completed)
Worked 8 hours
Jeff
Checked the thermostats and all the HVAC throughout the building and all is good. (Completed)
FBJ28844 and FBJ28859 Checked motion sensors for proper operation and is working good. (completed)
FBJ28854 Repaired damaged new white board and 2 other chalk boards. (Completed)
FBJ28860 Checked LCD projector and it is working good. (completed)
FBJ28865 Repaired the light in the baptism font. (completed)